Tuesday, February 26, 2008

Project Studio

With Luke now wanting to extend his music publishing capabilities further, we have gone into project mode and are extending his studio. This involves refurbishing the garage which has been in a state of disrepair for some years. The end and side walls of this end of the garage were cracked and ready to fall down. So after propping the roof up, I helped it on it's way. You can just see the bow in the side wall thats being held in place by bracing.






Then you rebuild it, adding a brand new door.


Yes I know the courses are not level but I felt more important to be able to "stitch" the bond into the side wall when the time came.







Once the walls had been built and the room was all cosy we put up 4" of acoustic lagging followed by two layers of 12mm plasterboard. The room became a lot quieter almost as soon as the last piece was up.



A hole was sawn through into the mixing room and a frame put in and sealed with caulking. This frame was later triple glazed.







Then the whole room was dry walled using the direct bonding method




Then we added the electrics all surface mounted

Next the floor!!!